top of page

Navigating Florida’s New Septic System Requirements

11 minutes ago
1 min read

Beginning January 1, 2024, new permit applications for commercial and residential onsite sewage treatment and disposal systems in the Indian River Lagoon Program Area must comply with ENR-OSTDS standards. Unlike the BMAP provisions described above, these requirements apply to lots of all sizes within the designated program area.


In addition, by January 1, 2030, certain existing commercial and residential properties in the Indian River Lagoon Program Area must either:

  • Connect to central sewer, if available; or

  • Upgrade to an ENR-OSTDS.


Importantly, this deadline applies even when an existing septic system is functioning. As with any regulatory requirement, property owners should confirm the property’s location, system status, sewer availability, and any applicable exemptions or local requirements before making decisions.



  • Facebook
  • YouTube
  • Instagram
New Logo Beige Tagline Color.png

© 2026 by REMAX Elite

Equal-Housing-Opportunity-Logo-300x270-300x270.png

We are pledged to the letter and spirit of U.S. policy for the achievement of equal housing opportunity throughout the Nation.

Contact Us

Tel: 321-752-5858

 

6022 Farcenda Place

Melbourne, FL  32940

 

1155 Malabar Road NE Suite 22
Palm Bay, FL 32907
​

Content, including images, displayed on this website is protected by copyright laws.
Downloading, republication, retransmission or reproduction of content on this website is strictly prohibited.

REMAX-Commercial-RGB-White.png
CMN-Logo-RGB-white.png
The-REMAX-Collection-Logo-RGB-White.png
bottom of page